6x Less Material: even though the construction materials are much lighter(250kg/m2) than the traditional materials(over 1500kg/m2), the floors and walls are solid with surefootedness, airtight and sound-proofing
5x Energy Efficient: 150mm thermal insulation for walls and roofs, triple
glazed plastic windows, external solar shading, heat insulation, fresh air heat recovery, LED lighting, yearly HAVC A/C energy consumption equivalent to 7 liters oil.
20x Purification: after 3 levels of purification, the purification efficiency for fresh air reaches 95%-99.9%; air exchanged 1-2.5 times per hour, and indoor air is 20x cleaner than out door air
1% Construction Waste: all components are factory made, construction waste, mainly package materials, result from on site set-up only and amount to 1% of the total weight of the building.
This is the first building in human history which combines almost all environmental friendly, comfortable and secure elements. So, we call it: Sustainable Building
6x Less Material: even though the construction materials are much lighter(250kg/m2) than the traditional materials(over 1500kg/m2), the floors and walls are solid with surefootedness, airtight and sound-proofing
5x Energy Efficient: 150mm thermal insulation for walls and roofs, triple
glazed plastic windows, external solar shading, heat insulation, fresh air heat recovery, LED lighting, yearly HAVC A/C energy consumption equivalent to 7 liters oil.
20x Purification: after 3 levels of purification, the purification efficiency for fresh air reaches 95%-99.9%; air exchanged 1-2.5 times per hour, and indoor air is 20x cleaner than out door air
1% Construction Waste: all components are factory made, construction waste, mainly package materials, result from on site set-up only and amount to 1% of the total weight of the building.
This is the first building in human history which combines almost all environmental friendly, comfortable and secure elements. So, we call it: Sustainable Building
Wow that is crazy
DWB
12-08-2010 08:59 AM
Amazing.
Ravage
12-08-2010 09:06 AM
Pretty neat.
I wonder how long it took to build each pre-fabricated module/section and the pre-sized, pre-constructed interior wall sections.
Way3
12-08-2010 09:18 AM
Very cool!!!
ottopottomouse
12-08-2010 09:20 AM
2 days to chuck it up like Lego and probably several months of factory time for the bits.
Riffhard
12-08-2010 09:25 AM
Takes me longer to put together a desk from IKEA.
loreen
12-08-2010 01:20 PM
Quote:
Originally Posted by Riffhard
(Post 17759242)
Takes me longer to put together a desk from IKEA.
Quoted for truth :1orglaugh
blonda80
12-08-2010 02:37 PM
that was fast :)
djroof
12-08-2010 02:40 PM
hmmmmm interesting...
2intense
12-08-2010 02:58 PM
wow wow wow
Deej
12-08-2010 03:07 PM
That all sounds way better than the norm... I wonder how much more it costs to make such haste...