Welcome to the GoFuckYourself.com - Adult Webmaster Forum forums.

You are currently viewing our boards as a guest which gives you limited access to view most discussions and access our other features. By joining our free community you will have access to post topics, communicate privately with other members (PM), respond to polls, upload content and access many other special features. Registration is fast, simple and absolutely free so please, join our community today!

If you have any problems with the registration process or your account login, please contact us.

Post New Thread Reply

Register GFY Rules Calendar Mark Forums Read
Go Back   GoFuckYourself.com - Adult Webmaster Forum > >
Discuss what's fucking going on, and which programs are best and worst. One-time "program" announcements from "established" webmasters are allowed.

 
Thread Tools
Old 11-13-2004, 07:44 PM   #1
Bob Saget
So Fucking Banned
 
Join Date: Nov 2004
Posts: 312
Introduction

Inventory Control Systems

As demand and lead times are variable, we can either


order fixed quantities of stock at variable times or
order variable quantities at fixed times
Fixed quantity systems (Re-order levels)


easy to manage
cope well with demand variability/changes and facilitate lower stocks
orders can also be processed for convenience e.g. small orders can be consolidated to secure supplier discounts.
Using EOQ, fixed systems initiate replenishment orders when stock falls below a pre-determined (re-order) level. Re-order level is calculated as mean demand during the mean lead time, plus the safety stock. As a rough indicator, half the mean lead time usage can be taken as the safety stock (RoL = I.5DL).

Two-bin replenishment system

Imagine two equally sized bins (bays, pallets or similar) used for storage in the warehouse or at the workstation storage point. The ROL be thus be seen visually. With the first bin empty, a new full bin is "called" to arrive before the second bin is exhausted. The call is rotated. With proper rotation system is efficient (little paperwork). In a computerised enviroment the bins/pallets themselves can be bar coded and their movement/position and batch numbers of bin components can be traced.

Stock records

A two bin system works is suited to components needing to be issued in large quantities and where the bin size and hence ROL can be checked simply. With many stock items this is inappropriate. More detailed control over issues is needed hence a stock record system showing receipts/issues and balance is required. Paper or computer records require time to check stock against reorder levels. There may be differences between the physical or actual stock and the book stock. "The record says we have 5 in the warehouse but I could only find three and one of these was damaged". Computerised systems enable replenishment orders to be raised as soon as stock falls below a reorder level.

In a supermarket, the record for each stock item is decremented as each sale is logged at the checkout. With computer interconnectivity, the regional warehouse receives the store's replenishment needs and makes up a replenishment package for next day delivery. Periodic stock checks to count the stock physically enable the store to feed in adjustment figures to reconcile physical against book stock. Thus stock losses can be accounted for.

Such systems assist with demand forecasting. Up-to-date demand figures feed in to reorder level and order quantity calculations.



--------------------------------------------------------------------------------

Fixed time/order cycle systems

Annual requirements for low value, low bulk items can be estimated and ordered in a routine re-order cycle.

We may need to set a maximum stock level (average demand + safety stock). At the routine re-order time current stock can be subtracted from the maximum to give the order quantity (frequency of ordering could be based on EOQ).

Safety stock must accommodate unexpected increases in demand and the risk of stock-out situation. Compare this to a re-order level system where the risk is limited only to variations in demand in the lead-time period. For a fixed time, re-order cycle system the time at risk is re-order lead time plus the re-order cycle time. Calculation of the maximum stock level formula gives a higher level of safety stock.

Comparing Responsiveness as demand changes

Re-order level approach
- average stock levels stay more or less the same and are less responsive to changes in demand. There is a risk of stock outs with inexpected rising demand but outstanding re-supply orders can be chased.

Re-order cycle systems
- rising demand can exhaust stocks with no outstanding orders in the pipeline.



--------------------------------------------------------------------------------

Which System?

Of the systems (annual demand, two-bin, re-order cycle, re-order level) none are universally versatile. Many organisations operate a hybrid. Choosing between fixed quantity or fixed time approaches depends on risking unexpected movement in demand against the costs of administering convenient, scheduled replenishment. The safety stock penalty of fixed re-order cycle methods worsens as stock usage value and demand variability rise. Generally fixed time systems suit stock with stable/predictable demand patterns and low usage values.

Risk and security.

Most cost benefits arise from attention to stock items of highest usage value where most costs lie (some lower value/usage items may be critical also e.g. key spares). Theft is always a risk even for bricks and JCB's stored on company building sites. Accurate stock records assist with security monitoring (detecting thefit) and control. A two-bin or annual demand system offers little security for high value, important, difficult to supervise items.

However, we can do this job!
Please contact me at AIM twobinsystem
Bob Saget is offline   Share thread on Digg Share thread on Twitter Share thread on Reddit Share thread on Facebook Reply With Quote
Old 11-13-2004, 07:55 PM   #2
Bob Saget
So Fucking Banned
 
Join Date: Nov 2004
Posts: 312
SLA 2 included
Bob Saget is offline   Share thread on Digg Share thread on Twitter Share thread on Reddit Share thread on Facebook Reply With Quote
Old 11-13-2004, 09:44 PM   #3
Dagwolf
President of Canada
 
Dagwolf's Avatar
 
Join Date: Sep 2003
Location: Leaving Hell, Entering Limbo
Posts: 23,141
__________________
Sleep well, and dream of large women.

Dagwolf is offline   Share thread on Digg Share thread on Twitter Share thread on Reddit Share thread on Facebook Reply With Quote
Old 11-13-2004, 09:46 PM   #4
fris
Too lazy to set a custom title
 
fris's Avatar
 
Industry Role:
Join Date: Aug 2002
Posts: 55,372
__________________
Since 1999: 69 Adult Industry awards for Best Hosting Company and professional excellence.


WP Stuff
fris is offline   Share thread on Digg Share thread on Twitter Share thread on Reddit Share thread on Facebook Reply With Quote
Old 11-13-2004, 09:49 PM   #5
WickedVenus
Confirmed User
 
Join Date: Aug 2004
Location: ICQ: 309691342 ---- Yahoo Messenger: wickedvenus_acv
Posts: 3,877
I had pizza for dinner!
__________________
SIG TOO BIG! Maximum 120x60 button and no more than 3 text lines of DEFAULT SIZE and COLOR. Unless your sig is for a GFY top banner sponsor, you may use a 624x80 instead of a 120x60. Let me repeat... A 120 x 60 button and no more that 3 lines of DEFAULT SIZE AND COLOR text.
WickedVenus is offline   Share thread on Digg Share thread on Twitter Share thread on Reddit Share thread on Facebook Reply With Quote
Old 11-13-2004, 09:50 PM   #6
Bob Saget
So Fucking Banned
 
Join Date: Nov 2004
Posts: 312
Quote:
Originally posted by fris
photoshop
Bob Saget is offline   Share thread on Digg Share thread on Twitter Share thread on Reddit Share thread on Facebook Reply With Quote
Old 11-13-2004, 09:53 PM   #7
Tam
Confirmed User
 
Tam's Avatar
 
Industry Role:
Join Date: Jan 2001
Location: In your face
Posts: 8,488
Quote:
Originally posted by Bob Saget
photoshop
That's not photoshopped, that's what he honestly looks like....
Tam is offline   Share thread on Digg Share thread on Twitter Share thread on Reddit Share thread on Facebook Reply With Quote
Old 11-13-2004, 09:55 PM   #8
Bob Saget
So Fucking Banned
 
Join Date: Nov 2004
Posts: 312
Quote:
Originally posted by Tam
That's not photoshopped, that's what he honestly looks like....
are you for real?
Bob Saget is offline   Share thread on Digg Share thread on Twitter Share thread on Reddit Share thread on Facebook Reply With Quote
Old 11-14-2004, 04:01 PM   #9
webmaster x
Confirmed User
 
Join Date: Mar 2004
Posts: 4,400
Quote:
Originally posted by Tam
That's not photoshopped, that's what he honestly looks like....
you got tobe kidding me.
webmaster x is offline   Share thread on Digg Share thread on Twitter Share thread on Reddit Share thread on Facebook Reply With Quote
Old 11-14-2004, 04:33 PM   #10
Bob Saget
So Fucking Banned
 
Join Date: Nov 2004
Posts: 312
Quote:
Originally posted by webmaster x
you got tobe kidding me.
I assure you, he is kidding you.
Bob Saget is offline   Share thread on Digg Share thread on Twitter Share thread on Reddit Share thread on Facebook Reply With Quote
Post New Thread Reply
Go Back   GoFuckYourself.com - Adult Webmaster Forum > >

Bookmarks
Thread Tools



Advertising inquiries - marketing at gfy dot com

Contact Admin - Advertise - GFY Rules - Top

©2000-, AI Media Network Inc



Powered by vBulletin
Copyright © 2000- Jelsoft Enterprises Limited.