View Single Post
Old 12-02-2005, 12:11 AM  
abyss_al
**LOOKING FOR TRADES**
 
abyss_al's Avatar
 
Join Date: Oct 2003
Location: Southern California
Posts: 15,605
Quote:
Originally Posted by jimb
Well for the lighting I hope to spend around $150-200 but can spead upto $700.00 if need be for a good professional package.

Tripod is the same thing, I want to spead $50 but if need be I will spend more.

Jim

just get a few construction lights and bounce them off the walls.. keep them far from the model and the sheets... construction lights get hot really fast

dont forget to set both cameras up for this lighting and fix ur white balance... have a comp/laptop there to see a few test shots in full size (do not rely on the little screen)...
__________________
EMAIL: allen @ vasmediagroup.com | ICQ: 311329761 | SKYPE: abyss.al | AIM: xABYSSxALx
abyss_al is offline   Share thread on Digg Share thread on Twitter Share thread on Reddit Share thread on Facebook Reply With Quote