First view inside the shop
Plastics side of the building. Notice the new lights! The metals side still has the sodium. We are doing the lights in groups of 100. These new lights will save nearly 60% of the energy costs it takes to run them. And I could get a car every month for what the electric bill is!
The metal side of the building. The coils of steel in this picture weight nearly 5000 pounds each. The VP of metals tells me we are scheduled to process over 3000 tons of steel this year.
This is the laser cell. This department runs 24 hours a day along with the plastics department. The rest of the metal shop runs 2 shifts and a Saturday shift from time to time.
