So today was a big disaster day.
In the datacenter where all our servers are colocated, all CRAC (airco) units caused a full power shut down because the temperature was above 40 degrees. High temperature, leaking aircos and lots of problems.
Results, 2x dead data switches, 2 server power supplies fucked, 1 harddisk in our database server damaged plus missing 1 day turnover and still recovering with restoring databases and data.
Damn I need some sleep