Quote:
Originally Posted by JuiceMonkey
At 12:41 a utility fault caused phase B of the main power feed of DC3 to disconnect which caused our ATS to transfer power to our generator until which time we were on our generator ?til 1:15. Our ATS read a fault and and went into EPO with respect to the initial issue which caused phase B to fail. Local service technicians are working on solving the problem as fast as possible.
|
attempting decoding....

|