Quote:
|
Originally Posted by Brad Mitchell
AdultEUHost, actually, it's easier here than at any other setup - guaranteed. All of those runs are 3-4' gigabit cat6 wired locally to that rack in the adjacent internal or external network switch. The covers on the cable management on the sides and between the two switches snaps out for easy access. Every run is visible and replaceable within moments.
Spudstr, it is a variation of the SC512.
SiMple... Maybe... but most of yours are SCSI Dell Dual Xeons.
To those few that think none of us work here because we already made the patch cords pretty... that's just the dumbest thing I've ever heard. And suggesting that it is acceptable for any host to be slobs in the datacenter is naive. Cabling, cooling, power management, labeling - these aren't incidental issues to hosting, these are important when it comes to serving your customers properly.
Brad
|
Thats true, Brad. But you have it almost too neat in there... if I didnt know any better I would say that you have Monk in charge of your NOC or something. I dont know, not trying to trash your thread or nothing but it just seems like something like this shouldnt be held out as a main selling point. Aww, fuck me. Im a moron, what do I know. Maybe I am jealious I couldnt keep my rack like that back before I reduced down to the three boxes I have now.
