|
Yeah installing that isnt 10 bucks. What we used to sell with them was a sync unit that takes over the power to a UPS synchronised the genset and switched to genset power and vice versa. Not cheap but that way its all auto-starting.
Plus get a decent tank yes. And a service contract. They gotta run every 6 months or year, tests need to be done. Installing these means getting a solid base to put them on too. Insulation to decrease sounds.
Dont know how its arranged over there, but they need to be within a certain db(A) reach to have approval to start these in an area with lotsa houses.
|