View Single Post
Old 05-23-2005, 09:22 PM  
Blackrose
Confirmed User
 
Join Date: Aug 2001
Location: Carnal City
Posts: 344
tech advice please

i have two old servers atm ... a dual 1.4ghz & dual 1.2ghz p3 processors each with 2gb of ram ... at peaks, my load averages are at most 0.5 on each of the server ... now, im going to get a new server and then move the contents of both servers into one badass server ... combined, these two servers are eating up about 25-30mbps monthly .... here are the specs of bad ass server :

Bandwidth: 50Mbps
Server: Dell 1850
CPU: Dual 2.8Ghz Xeon w/1MB Cache
Ram: 2 GIG (might get it to 3gb sometime soon)
Hard Drive: 73 GIG SCSI

now my question is, do you think the badass server would be able to handle the load of the sites combined from the two older servers ... with scripts that include 3 ucj, 1 atx, 2 comus, 1 tmanager, 1 smartthumbs, 1 at3 & 1 madtgp

please tell me what you guys think ...

thanks in advance
__________________
The die is cast...
The dice are rolled...
You look like shit...
I feel like gold
-- Uh, me?
Blackrose is offline   Share thread on Digg Share thread on Twitter Share thread on Reddit Share thread on Facebook Reply With Quote