View Single Post
Old 11-08-2004, 05:13 PM  
kinetic
Confirmed User
 
Industry Role:
Join Date: Mar 2003
Location: Loch Ness
Posts: 395
It usually takes 2 days, maximum 3 if you use the correct wiring details they give on the site.
kinetic is offline   Share thread on Digg Share thread on Twitter Share thread on Reddit Share thread on Facebook Reply With Quote