|
Mine is done and is very nice. I used Sherwin Williams Tile Clad industrial epoxy. It is recommended that you sand and etch the floor before painting. Prep is very important, as dirt and other contaminants such as petroleum, etc. will cause the epoxy to lift.
Etching the floor is the nastiest part, it requires a ton of ventilation and liberal use of muratic acid.
Once I had everything prepped (which took 3 days), I only spent 45 minutes spraying the floor. It takes about another 3-4 days to set-up and dry completely.
|