|
I make two lists.
List 1) Post shit, fix shit, and basically do some shit that will take a minimum of 4 to 6 hours to accomplish. Then I say, this is done by 9am and I get a 1/2 to fuck off. Then back to work and such.
List 2) How much do I want to make, did I hit it? Once I do I generally start to sluff off. If I don't I keep going at 200% so I don't have to work so hard the next day... Then I bank that. And on Friday I fuck off a lot. Not jack off. Fuck off.
|