View Single Post
Old 03-11-2011, 02:12 PM  
DateDoc
Outside looking in.
 
DateDoc's Avatar
 
Industry Role:
Join Date: Feb 2005
Location: To Hell You Ride
Posts: 14,243
Japanese authorities and the U.S. military on Saturday were racing to find ways to deliver new backup generators or batteries to a nuclear power reactor whose cooling facilities have been crippled by a loss of power as a result of the earthquake.

The reactor, owned by Tokyo Electric Power Co., is currently drawing on battery power that may last only a few hours. Without electricity, the reactor will be unable to pump water to cool its hot reactor core, possibly leading to a meltdown or some other release of radioactive material.

Japanese authorities informed the International Atomic Energy Agency's Incident and Emergency Center that they have ordered the evacuation of about 3,000 residents within a 1.9-mile radius of the Fukushima Daiichi nuclear power plant, and told people within a 16.2-mile radius to remain indoors, according to the IAEA Web site.

The cooling problem is with the second of six reactors at the plant, located on the east coast of Japan about 200 miles north of Tokyo and south of the heavily damaged town of Sendai. Separately there were reports of elevated radiation levels inside the control room of one of the other reactor units, which was built 40 years ago. Sources said that the authorities were contemplating venting from that unit.

more - http://www.washingtonpost.com/wp-dyn...031103673.html
__________________
DateDoc is offline   Share thread on Digg Share thread on Twitter Share thread on Reddit Share thread on Facebook Reply With Quote