I've built one house and looking to build again this year. It's much better drawing up a list of everything you want then whittling it down to something affordable/acceptable, rather than trying to add to an existing place.
Around here it takes about 2-3 months for tendering and contracts, another month or two for permits, then 4-5 months build time. Should be less than a year from the time you walk into the sales office and say "that looks cool, where do I sign"
|